Creditcoin provides a faucet tool to allow users to conveniently obtain CTC Substrate or CTC EVM tokens so they can participate in testing and development on the Creditcoin testnet.

  1. Make sure you are a member of Creditcoin Discord server.
  2. Navigate to the designated channel labeled: ‘token-faucet’
  3. Initiate the faucet request by using the specified command and providing a valid Substrate address.
/faucet address:yourValidSubstrateAddressGoesHere
  1. Upon submission, the bot will promptly acknowledge the request with a confirmation message stating “CTC faucet submitted”.

  1. Continue waiting until the bot confirms again in the same thread that “CTC Faucet successful”.

At this point, you should be able to see the CTC tokens in your account’s balance. Additionally, you can view the block and the Extrinsic corresponding to your faucet request in the thread created by the bot.

  1. Make sure you are a member of Creditcoin Discord server.
  2. Navigate to the designated channel (same as the Substrate Token Channel) labeled: ‘token-faucet’
  3. Initiate the faucet request by using the specified command and providing a valid EVM address.
/faucet address:yourValidEVMAddressGoesHere
  1. Upon submission, the bot will promptly acknowledge the request with a confirmation message stating “CTC faucet submitted”.

  1. Continue waiting until the bot confirms again in the same thread that “CTC Faucet successful”.